Convention in Spain
I have the fortune to participate in a convention here in Spain with one of the biggest oil company’s in Scandinavia.
It’s all very well prepared and organised and you are proud to be a chosen partner to this company.

Today we open the fair where we showed our Bag n´ Box concept along with the CO2 compensated pre-wash.
Both concepts is right along with the hosts environmental valuations.

The success was huge and our Norwegian distributor has a lot of work taking care of all this prospects.
Product development
is vital for progress in our daily work. We meet new competition, new demands, new markets, new regulations and our own ideas of new concept.

To cope with this our laboratory needs to priority our projects.
A project takes between 3-6 months to finalise and get ready for the market.
We follow a three step process:
- Laboratory tests as the first step
- Small field test as the second
- Full scale test as the third and last one
When this is done our purchasing department needs to look into the supplier if it’s a new one.
All the documentation around a new raw material is to be documented so we are sure that when the delivery trucks arrive we can check out if the contents are what it should be.

In our producing process we take three quality samples to ensure traceability for least three years.
One of each raw material in the batch
One of the produced batch
The first container that leaves the filling machine up to 2,5 L bottles.
Our warehouse ship some time wrong products to our customers. All that has been out our facility must be controlled by our laboratory.
The returning gods is checked of our technicians before their released in to the warehouse again.
Our control system is rescuers demanding but it ensure our quality standards to you as a costumer.
-
Recent
-
Links
-
Archives
- October 2009 (4)
- September 2009 (4)
- June 2009 (2)
- May 2009 (3)
- March 2009 (2)
- February 2009 (1)
- January 2009 (3)
- December 2008 (2)
- November 2008 (4)
-
Categories
-
RSS
Entries RSS
Comments RSS